Share
 
 

Step 3 of 5: Optimizing Facility Performance

Facility managers, CEOs, and CFOs all face headwinds in managing their facility investments. Whether it be because of technological complexity or just a lack of time and funding, building owners struggle to operate their facilities at optimal levels. This means they are losing money they could be saving and energy they could be conserving. Below is Step Three of a five-step series on optimizing your facility performance and maximizing your return on investment. These optimization metrics include:

  • Energy Savings
  • Utility Incentives
  • Operation and Maintenance Savings
  • Increased Occupant Comfort, Health, and Productivity
  • Reduced Carbon Emissions

Step 3: Optimizing Capital Projects – Commissioning (Cx)
Why optimize your capital project investments? Because there’s never a better time to improve your facility performance than when you’re planning, designing, and constructing building systems.

How?


  • Create a master Cx scope that can be specifically tailored for each project.
  • Begin the planning phase of the Cx process with the owner’s project requirements (OPR) and basis of design (BOD), then continue the process through the warranty period.
  • Apply analytics software to automate and enhance the process.
  • Seek independent advice to select the software package that best fits your needs. Considerations include: packaged vs. customizable, ability to scale, independence from controls system(s), independence from engineering, etc.

What is Commissioning?
A quality-oriented process for verifying and documenting that the performance of facilities, systems, and assemblies meet defined objectives and criteria established during planning and design.



Keep an eye on your email for Steps 4-5 of the Five-Step Process!

Step 3: Optimizing Capital Projects
Step 4: Sustaining Optimization
Step 5: Maximizing Building Controls

Who We Are
Sitton Energy Solutions is an independent energy management firm that helps clients maximize their energy savings and return on investments.
The Sitton Solution
A unique combination of Comprehensive Energy Strategy™ (CES™), Integrated Energy Analytics™ (IEA™), and Independent Engineering that saves clients money on their facilities at the maximum return-on-investment. Sitton Energy Solution’s definition of return on investment goes beyond the financial incentives, as it creates facilities that are environmentally friendly and safer, more productive places to work.
Follow Us On
 
 
 
 
Missouri Offices
4240 Duncan Avenue
St. Louis, MO 63110

1828 Walnut Street, 3rd floor
Kansas City, MO 64108


Illinois Office
1177 North Green Mount Road Suite 200
O'Fallon, IL 62269

Colorado Office
1536 Wynkoop Street
Suite 420
Denver, CO 80202

Contact Us:
(314) 309-2029






Email Marketing by ActiveCampaign